This project involves pavement strengthening and widening on the Stuart Highway in the NT, between km 251.40 and 255.50. No bridge works are included, with all activities focused on the approaches to the Cullen Bridge. The tender closes on 11 June 2026.
This project involves the construction and rehabilitation of a section of the Stuart Highway between 251.4 km and 255.5 km. No works will be undertaken on the bridge structure itself. All activities are confined to to both ends of the low-level Cullen Bridge.
A free Bindy account unlocks the workflow that wins this tender — no credit card required.